Precast bridge girders installation techniques in an infrastructure project

Published: 23 March 2023
on channel: KSSE Structural Engineers
4,889,796
39k

How bridge girders are connected?
For steel box girders, the girders are normally fabricated off site and lifted into place by crane, with sections connected by bolting or welding. If a composite concrete bridge deck is used, it is often cast in-place using temporary falsework supported by the steel girder.#innovation #bridge #subscribe